Leader Standard Work (LSW) is not a document. It is a system that stabilizes leadership behavior, exposes gaps, and drives improvement—only when connected to the full Lean leadership engine.
| Car Part | LSW Equivalent | Failure if Isolated |
|---|---|---|
| Engine | LSW document | Runs but goes nowhere |
| Transmission | Gemba walks | No power to process |
| Fuel | Visual controls | Starves the system |
| Ignition | Coaching | No spark of learning |
| Exhaust | Reflection | Builds toxic waste |
| Time | Task | Tool | Std | Actual | Deviation |
|---|---|---|---|---|---|
| 07:00 | Safety Gemba (Line 1) | Board | 10 min | 12 min | +2 |
| 07:30 | Huddle (SQDC review) | Board | 15 min | 14 min | -1 |
| 08:00 | 5S audit (Zone A) | Checklist | 3/5 | 2/5 | -1 |
| 09:00 | Coach 1 problem | A3 | 1 | 1 | 0 |
| 15:00 | Action follow-up | Sticky | 3 | 2 | -1 |
Columns:
| Link | How to Connect |
|---|---|
| LSW → Gemba | 80% of LSW tasks at the work |
| Route | 2 fixed paths, 8–12 stops |
| Cadence | Daily (supervisor), 3x/week (manager), weekly (director) |
Gemba Script (3 min/stop)
| Visual | LSW Link |
|---|---|
| SQDC board | Check at 07:30 |
| Andon lights | Respond <5 min |
| Action board | Close 3/day |
| 5S map | Audit Zone A |
Rule: No visual = no LSW task
| LSW Task | Coaching Output |
|---|---|
| Coach 1 problem | 1 A3 updated |
| Ask “Why?” | 1 root cause found |
| Model PDCA | 1 experiment launched |
Coaching Kata (2 min)
| Time | Tool | Input |
|---|---|---|
| End of shift | 5-min journal | LSW sheet |
| Questions | ||
| 1. What deviated? | ||
| 2. Why? | ||
| 3. What will I change tomorrow? |
Weekly Review (30 min)
↓ (Transmission)
Gemba Walks
↓ (Fuel)
Visual Controls
↓ (Ignition)
Coaching Kata
↓ (Exhaust)
Daily Reflection
↓
Improved LSW → Stable Process → Better Results
| Level | KPI | Target |
|---|---|---|
| Document | % LSW tasks done | >95% |
| Gemba | % tasks at work | >80% |
| Visual | % boards updated | 100% |
| Coaching | Problems coached/day | 1–3 |
| Reflection | Deviations actioned | 100% |
| Week | Action |
|---|---|
| 1 | Draft LSW (80% Gemba) |
| 2 | Map 2 routes, install 5 visual boards |
| 3 | Train coaching kata (role-play) |
| 4 | Pilot 1 leader, audit daily |
| Site | LSW % | Safety | Quality | Delivery |
|---|---|---|---|---|
| Plant A | 96% | -42% incidents | +18% FPY | +11% OTD |
| Plant B | 64% | +11% incidents | -9% FPY | -6% OTD |
Plant B: LSW isolated → no Gemba → no visuals
| Symptom | Root Cause | Fix |
|---|---|---|
| LSW = checklist | No Gemba | Force 80% at work |
| No deviations | Faked data | Leader audits randomly |
| No coaching | “Too busy” | Block 1 hr/day |
| No reflection | No time | 5 min end-of-day |
[ ] 80% tasks at Gemba
[ ] Visuals at every stop
[ ] 1 coaching kata/day
[ ] 5-min reflection
[ ] Weekly Pareto + adjust
A checklist in a binder is scrap. LSW connected to Gemba, visuals, coaching, and reflection is the engine that drives Lean.
Start the ignition.
Your Turn: Post your top 3 LSW tasks below. We’ll connect them to the system.